Submit a ticketCall us

Have You Auto Renewed? If not, you're missing out.
The SolarWinds Renewal Program comes with a host of benefits including the most recent product updates, 24/7 technical support, virtual instructor-led training and more. Experience all of this with the convenience of Auto Renewal, and never worry about missing any of these great benefits. Learn More.

Home > Success Center > Archive > 2017December13 - Deletes > Failed to load Scheduled Jobs

Failed to load Scheduled Jobs

Created by Mark Aliola, last modified by Kevin.Swinson on Dec 13, 2017

Views: 696 Votes: 0 Revisions: 4

Overview

After upgrading to VMAN 6.3, the scheduled report jobs or any related navigation to reports result to the following error message:

 

Failed to load Scheduled Jobs

Environment

VMAN 6.3

Cause 

This is because of the reports functionality after upgrade to VMAN 6.3.

Resolution

  1. Download VMAN 6.3 HotFix 1 on the Customer Portal.
  2. Install HotFix 1 using the VMAN Administrator Console, click SolarWinds Management tab > HotFix.
Last modified

Tags

Classifications

Public